Drainage design mistakes that cost thousands
- martinyoung5
- Jun 18
- 3 min read
A Developer's Guide to Avoiding Expensive Errors
Prepared by The Drainage Designers - Your Expert Drainage Design Partners

MISTAKE NUMBER 1: INADEQUATE SITE ANALYSIS AND TOPOGRAPHICAL SURVEYS
The Problem: Many developers try to cut corners by using outdated or insufficient topographical data, thinking they'll save a few hundred pounds upfront.
The Real Cost: This seemingly minor oversight can lead to complete design failures requiring £15,000-£30,000 in remedial work. When drainage systems are designed without proper ground levels and site conditions, water doesn't flow where it's supposed to go.
Why This Happens: Developers often receive basic site plans that look adequate but lack the precision needed for proper drainage design. Without accurate levels to OS National Grid standards and detailed ground condition data, even the most experienced designers are working blind.
The Solution: Always invest in comprehensive topographical surveys in DWG format before any design work begins. At The Drainage Designers, we refuse to start projects without proper survey data because we've seen too many developers face expensive failures from this shortcut.
MISTAKE NUMBER 2: IGNORING SOAKAWAY TESTING REQUIREMENTS
The Problem: Assuming ground conditions are suitable for standard drainage solutions without proper soakaway testing.
The Real Cost: £20,000-£50,000 in redesign and reconstruction costs when drainage systems fail because the ground can't handle the water load as designed.
Why This Happens: Soakaway tests seem like an unnecessary expense during the planning phase, but ground permeability varies dramatically even within the same site. Clay soils, high water tables, or contaminated ground can render standard soakaway systems completely ineffective.
The Solution: Conduct proper soakaway testing before finalising drainage designs. Our team at The Drainage Designers has developed alternative solutions for challenging ground conditions, including green roofs, upsized pipes for storage, and innovative SuDS systems that work even in difficult soil conditions.
MISTAKE NUMBER 3: POOR COORDINATION WITH WATER AUTHORITIES
The Problem: Failing to understand and plan for water authority requirements and approval processes.
The Real Cost: Project delays of 3-6 months and additional costs of £10,000-£25,000 when designs don't meet authority standards and require complete redesign.
Why This Happens: Each water authority has specific requirements, and these change regularly. Many designers submit plans that look technically sound but don't align with current local authority standards or water company adoption requirements.
The Solution: Work with drainage designers who maintain current relationships with local authorities and understand the approval process. The Drainage Designers achieves a 75% first-submission approval rate for SuDS proposals because we stay current with all authority requirements and design to their standards from day one.
MISTAKE NUMBER 4: UNDERESTIMATING SURFACE WATER MANAGEMENT
The Problem: Designing drainage systems that can't handle extreme weather events or don't comply with modern SuDS requirements.
The Real Cost: £30,000-£100,000+ in flood damage, insurance claims, and mandatory system upgrades when developments can't handle surface water during heavy rainfall.
Why This Happens: Climate change has increased rainfall intensity, but many drainage designs still use outdated calculations. Additionally, 90-100% of modern projects require SuDS compliance, but inexperienced designers often underestimate the complexity of these systems.
The Solution: Design with future climate conditions in mind and ensure full SuDS compliance from the start. Our team specialises in SuDS proposals and sustainable drainage solutions including swales, rain gardens, and green infrastructure that not only meet regulations but add value to developments.
MISTAKE NUMBER 5: INADEQUATE PLANNING FOR MAINTENANCE ACCESS
The Problem: Creating drainage systems that work initially but become maintenance nightmares, leading to system failures and expensive emergency repairs.
The Real Cost: £5,000-£15,000 annually in excessive maintenance costs, plus potential liability issues when systems fail due to poor maintenance access.
Why This Happens: Designers focus on installation without considering long-term maintenance requirements. When drainage components are inaccessible or maintenance schedules aren't properly planned, systems deteriorate rapidly.
The Solution: Design with maintenance in mind from day one. The Drainage Designers provides comprehensive maintenance schedules for all major drainage components, with monthly, quarterly, and annual task planning that keeps systems functioning optimally for decades.
THE FINANCIAL IMPACT: WHAT PROPER DESIGN SAVES YOU
When you add up these potential costs, poor drainage design can easily cost developers £80,000-£200,000+ on a single project. Compare this to investing £3,000-£6,000 in proper professional drainage design upfront.
Our Track Record:
75% of our SuDS proposals approved on first submission
4-week average project timeline from consultation to completion
30% of our business comes from repeat clients who trust our expertise
Over 40 years of combined experience preventing these exact mistakes