top of page
Search

From Planning to Approval: Navigating the Drainage Design Process in England

  • martinyoung5
  • Oct 8
  • 9 min read

Whether you're developing a single residential property or a large housing estate, understanding the drainage design process is essential for keeping your project on track. In England, drainage design involves multiple stakeholders, regulatory requirements, and technical considerations that can seem daunting at first glance.

This guide breaks down the entire process from initial planning through to final approval, helping you navigate each stage with confidence.


Understanding the Regulatory Landscape

Before diving into the design process itself, it's crucial to understand who oversees drainage in England. Your drainage design will need to satisfy several authorities, each with specific requirements and approval processes.


The Local Authority Building Control department ensures your drainage system complies with Building Regulations, particularly Part H which covers drainage and waste disposal. Meanwhile, the Lead Local Flood Authority (LLFA) reviews surface water drainage proposals to ensure they manage flood risk appropriately, especially for major developments. Water companies also play a vital role, as they must approve any connections to public sewers and assess the capacity of existing infrastructure.


Additionally, your project must align with National SuDS Standards and guidance from the CIRIA SuDS Manual, which provide the framework for sustainable drainage solutions across England.


Stage One: Initial Assessment and Site Survey

Every successful drainage design begins with a thorough understanding of your site. This initial stage sets the foundation for everything that follows and can prevent costly mistakes down the line.


A comprehensive topographical survey is essential, providing accurate ground levels, existing drainage infrastructure, and site features that will influence your design. You'll also need to identify existing services (water mains, sewers, utilities) to avoid conflicts and plan connections appropriately.


Understanding your site's soil conditions through percolation tests is particularly important if you're considering soakaways or other infiltration-based drainage solutions. These tests determine how quickly water can drain through the soil, directly impacting which drainage methods are viable.


Don't overlook the importance of identifying any site constraints early on. Protected trees, conservation areas, archaeological considerations, or proximity to watercourses can all significantly influence your drainage design options.


Stage Two: Understanding Flood Risk and Assessment Requirements

Determining whether your development requires a Flood Risk Assessment (FRA) is a crucial early step. The requirements depend on your site's flood zone classification and the nature of your development.


The first step is to check your site's flood zone using the government's Flood Map for Planning service at flood-map-for-planning.service.gov.uk. This will show whether your site is in Flood Zone 1 (low probability of flooding), Flood Zone 2 (medium probability), Flood Zone 3 (high probability), or Flood Zone 3b (functional floodplain).


You will need to complete a Flood Risk Assessment for all development (including minor development and changes of use) proposed in Flood Zone 2 or 3, or in an area within Flood Zone 1 that has critical drainage problems. For sites in Flood Zone 1 without critical drainage problems, an FRA is generally not required unless your Local Planning Authority's Strategic Flood Risk Assessment indicates the site will be at increased risk of flooding from rivers or the sea during the development lifetime.


If an FRA is required, it must examine all potential sources of flooding including fluvial flooding from rivers and watercourses, surface water flooding from rainfall, groundwater flooding, and the potential for sewer flooding. The Environment Agency's flood maps provide essential baseline data, but a detailed assessment must also consider local topography, drainage patterns, and climate change projections.


The level of detail required in your FRA depends on both your site's flood zone classification and your development's vulnerability classification. More vulnerable developments (such as residential properties) in higher risk zones require more comprehensive assessments and must demonstrate appropriate mitigation measures.


For minor extensions (household or non-domestic extensions with a floor space of no more than 250 square metres) in Flood Zones 2, 3 or 3b, you can follow the Environment Agency's standing advice for minor extensions. For other development types, you'll need to follow the detailed guidance for your specific flood zone and vulnerability classification.


Stage Three: Drainage Strategy Development

With your site assessment and flood risk evaluation complete, you can now develop a comprehensive drainage strategy. This is where technical expertise becomes invaluable, as you'll need to balance regulatory requirements, site constraints, and cost considerations.


Your strategy must address both foul water (from toilets, sinks, and appliances) and surface water (from roofs, driveways, and other hard surfaces) separately, as modern regulations require these to be kept in separate systems wherever possible.


For surface water management, the updated drainage hierarchy in the National SuDS Standards now prioritises options in the following order. First, you must consider rainwater harvesting for reuse, such as collecting rainwater for toilet flushing, irrigation, or other non-potable uses. This approach reduces both the volume of water requiring disposal and the demand on mains water supply.

If rainwater harvesting alone cannot manage all surface water, the next option is infiltration methods such as soakaways, infiltration basins, or permeable surfaces. These allow water to soak naturally into the ground, recharging groundwater and reducing runoff. However, infiltration is only viable where soil conditions and groundwater levels permit.


When neither rainwater harvesting nor infiltration can adequately manage surface water, you should consider discharge to a watercourse. This must be done at controlled rates to avoid increasing flood risk downstream. Only when none of these options are feasible should you consider connecting to a public surface water sewer, and even then, you'll typically need to incorporate attenuation storage to limit discharge rates to agreed levels.


Sustainable Drainage Systems (SuDS) should be integrated into your strategy from the outset. These nature-based solutions (such as permeable paving, swales, rain gardens, and detention basins) manage surface water at source, reduce flood risk, improve water quality, and can enhance biodiversity and amenity value. The National SuDS Standards emphasise the importance of designing drainage systems that deliver multiple benefits beyond flood management alone.


Stage Four: Detailed Design and Calculations

Once your drainage strategy is agreed in principle, the detailed design phase begins. This involves precise calculations, technical drawings, and specification of all drainage components.


Hydraulic calculations determine pipe sizes, gradients, and flow rates to ensure your system can handle design storm events. In England, drainage systems are typically designed to accommodate a 1-in-30-year storm event as a minimum, with allowances for climate change that can add 40% or more to rainfall intensity projections.


Your detailed design must include drainage layout drawings showing pipe routes, inspection chambers, connections, and all drainage features. These drawings need to be accurate and comprehensive, as they'll form the basis for construction and will be scrutinised during the approval process.


For SuDS features, you'll need to provide detailed design specifications including dimensions, construction details, planting schedules, and maintenance requirements. The LLFA will want to see evidence that your SuDS features are appropriately sized and will function effectively throughout their design life.


Stage Five: Pre-Application Consultation

Before submitting formal applications, it's often beneficial to engage in pre-application discussions with the relevant authorities. This informal stage can save considerable time and expense by identifying potential issues early.


The LLFA, in particular, welcomes early engagement on surface water drainage strategies for major developments. They can provide guidance on local requirements, acceptable discharge rates, and preferred SuDS approaches. Similarly, water companies can advise on connection points, capacity constraints, and any infrastructure improvements that might be needed.


Pre-application consultation isn't mandatory, but it's highly recommended for complex sites or innovative drainage solutions. The feedback you receive can help refine your design before formal submission, reducing the likelihood of costly revisions later.


Stage Six: Formal Applications and Approvals

With your design finalised and pre-application feedback incorporated, you're ready to submit formal applications. The specific approvals you'll need depend on your project, but typically include several key submissions.


Building Regulations approval for drainage is obtained through your Local Authority Building Control or an Approved Inspector. You'll submit detailed drawings and calculations demonstrating compliance with Part H of the Building Regulations.


For surface water drainage on major developments (typically 10 or more dwellings), you'll need approval from the LLFA. This involves submitting a detailed drainage strategy, calculations, and maintenance plan. The LLFA has 21 days to respond to consultations, though complex schemes may require additional time.


If you're connecting to public sewers, you'll need a Section 106 agreement with the water company. This legal agreement covers connection points, design standards, and adoption of sewers that will become public infrastructure. Water companies typically require designs to comply with Sewers for Adoption standards.


For discharges to watercourses, you may need consent from the Environment Agency or LLFA, depending on the watercourse classification. This ensures your discharge won't harm water quality or increase flood risk downstream.


Stage Seven: Addressing Comments and Revisions

It's rare for drainage designs to be approved without any comments or requested revisions. Authorities may request additional information, clarification on design assumptions, or modifications to address specific concerns.


Common requests include additional attenuation to further reduce discharge rates, more detailed maintenance plans for SuDS features, or evidence of consultation with neighbouring landowners for off-site drainage solutions. Addressing these comments promptly and comprehensively is key to maintaining your project timeline.


Keep detailed records of all correspondence and revisions. This documentation trail proves invaluable if questions arise during construction or in future dealings with authorities.


Stage Eight: Final Approval and Construction

Once all comments are addressed and approvals obtained, you can proceed to construction. However, your drainage designer's involvement shouldn't end here.

Regular site inspections during construction ensure the drainage system is installed according to the approved design.


Variations from the design (whether due to unforeseen ground conditions or construction constraints) should be assessed by your drainage designer and, if significant, reported to the approving authorities.


For sewers to be adopted by water companies, you'll need to arrange inspections at key stages of construction. These typically include inspections of pipe bedding, completed pipe runs before backfilling, and final inspection before adoption.


Stage Nine: Completion and Handover

As your project nears completion, several final steps ensure your drainage system is properly documented and maintained.


As-built drawings should be prepared showing the drainage system as actually constructed, including any variations from the original design. These drawings are essential for future maintenance and will be required by water companies for adoption purposes.


A comprehensive maintenance manual should be provided, particularly for SuDS features. This document outlines inspection schedules, routine maintenance tasks, and remedial actions if problems arise. For developments with private drainage, clear responsibility for maintenance must be established, often through management companies or residents' associations.


Finally, ensure all necessary certification is obtained and passed to the building owner. This includes Building Regulations completion certificates, water company adoption agreements, and any environmental permits or consents.


Common Pitfalls and How to Avoid Them

Even with careful planning, drainage projects can encounter obstacles. Being aware of common pitfalls helps you avoid them.


Starting the drainage design too late in the project timeline is perhaps the most frequent mistake. Drainage should be considered from the earliest design stages, as it can significantly influence site layout, levels, and development viability. Retrofitting drainage into a finalised site layout often leads to compromised solutions and additional costs.


Underestimating the time required for approvals is another common issue. While standard timelines exist, complex sites or innovative solutions may require extended consultation periods. Build adequate contingency into your programme.

Failing to properly investigate existing drainage infrastructure can lead to nasty surprises during construction. Unknown culverts, abandoned sewers, or inadequate capacity in existing systems can derail projects. Thorough site investigation, including CCTV surveys of existing drains where appropriate, is time and money well spent.


Inadequate consideration of maintenance requirements, particularly for SuDS features, can lead to long-term problems. Design with maintenance in mind, ensure access for maintenance equipment, and establish clear maintenance responsibilities from the outset.


The Value of Professional Expertise

Navigating the drainage design process requires specialist knowledge of regulations, technical design, and approval procedures. While this guide provides an overview, every site is unique and presents its own challenges.


Engaging experienced drainage designers early in your project ensures that drainage considerations inform site layout, that designs comply with all relevant standards, and that approval processes proceed smoothly. Professional designers maintain relationships with approving authorities, understand local requirements and preferences, and can anticipate potential issues before they become problems.


The cost of professional drainage design is modest compared to the potential costs of delays, redesigns, or non-compliant installations. More importantly, proper drainage design protects your development from flood risk, ensures compliance with Building Regulations, and provides peace of mind for future occupants.


Looking Ahead

The drainage design landscape continues to evolve, with increasing emphasis on sustainable solutions, climate change resilience, and biodiversity enhancement. Recent updates to planning policy and Building Regulations reflect growing awareness of flood risk and the importance of managing surface water sustainably.


Future developments are likely to see even greater integration of blue-green infrastructure, with drainage systems designed to provide multiple benefits beyond flood management. Water quality, urban cooling, biodiversity, and amenity value are increasingly important considerations in drainage design.


Staying informed about regulatory changes and best practice developments ensures your projects remain compliant and incorporate the most effective drainage solutions available.


Conclusion

From initial site assessment through to final approval and construction, the drainage design process involves multiple stages, various stakeholders, and careful coordination. While the process may seem complex, breaking it down into manageable stages makes it far more approachable.


Success lies in starting early, engaging with authorities proactively, and working with experienced professionals who understand both the technical requirements and the approval processes. With proper planning and expert guidance, you can navigate the drainage design process efficiently, ensuring your development is protected from flood risk, compliant with all regulations, and built to last.

ree

Whether you're an architect designing your first residential project or a developer planning a major housing estate, understanding this process empowers you to make informed decisions, ask the right questions, and ensure drainage receives the attention it deserves in your project planning.

 
 
 

Comments


Drainage Designers logo

Contact Us

Business Hours

Mon-Fri: 9am - 5pm

Sat-Sun: Closed​

Connect With Us

  • Whatsapp
  • Yell logo
  • Google Business Profile
  • LinkedIn
Find us on Yell

The Drainage Designers, registered as a limited company in England and Wales under company number: 09135175.
Registered Company Address: Collingwood Buildings, 38 Collingwood Street, Newcastle upon Tyne NE1 1JF

Terms of Use | Privacy & Cookie Policy | Trading Terms

© 2025. The content on this website is owned by us and our licensors. Do not copy any content (including images) without our consent.

bottom of page